Portfolio

Project: Chestnut Street Pumping & Filtration Plant Feasibility Study
Client: City of Orange Township

potable water

 

In order to bring its largest single water treatment and pumping facility into compliance with current Federal and State regulations and to ensure a safe and dependable water supply capable of meeting anticipated future demands, the City of Orange Township retained GSE to undertake a study to determine the most cost effective approach in replacing the existing facility with one that meets all current and pending water quality standards and will be sized to meet anticipated future City water demands to meet future re-development plans. The subject study included detailed facility site inspections and testing, detailed water demand analysis required for firm capacity determinations, and conceptual design and layout of new facility options to a level of detail necessary to generate construction budget estimates. GSE’s recommended option addressed the many challenges associated with the project including significant site constraints, staging requirements to ensure no interruption of service while the new facility was being constructed, and equipment and equipment sizing selections that will allow for facility expansion to effectively address pending water quality issues without materially impacting the operation of the new facility. The new facility is presently in the final design stages and is scheduled to begin construction in 2007.

Back to Project List

 

Design by Yellow Lab