Portfolio

Project: Water Distribution System Water Hammer Analysis
Client: Township of Cedar Grove

potable water

 

The Township’s water distribution system has historically been plagued with operating anomalies such as water hammer, air entrapment, and unstable pressures. The distribution grid most affected historically by these occurrences is the Township’s main or low service area. Recently the problems with air entrapment have been exacerbated in this section resulting in numerous complaints from Township residents. The Township retained GSE to investigate the cause of these occurrences and to provide recommendations towards mitigating the problem. In witnessing the system operation, GSE suspected that system surges are a significant contributor to these occurrences. As such, GSE developed and implemented an approach towards confirming, locating and mitigating the unstable system conditions in area in question. The approach which included an inspection of all air entry points, witnessing the pump operating sequences, and gauging system behavior in the areas most affected, GSE was able to confirm that the system operations are producing system surges which in turn are allowing air to enter the water distribution system at the areas in question. GSE provided specific mitigation steps at the source (pump station) which when implemented mitigated the problem in total.



Back to Project List

 

Design by Yellow Lab